Magil
Montreal: 514-341-9899 Vancouver: 604-565-5476 London: 519-451-5270 Toronto: 905-890-9193 Contact Us

Projects

Search

Ontario Power Generation Darlington Energy Complex - LEED Gold

Client Information

  • Name: Ontario Power Generation

Project Information

  • Location: Clarington, ON
  • Delivery Method: Design-Build
  • Sector: Buildings, Industrial
  • Sub Sector: Office, Power, Warehouse
  • Status: Completed
  • Completion Date: March 2013
  • Size: 300,000 sq. ft.
  • Leed: LEED Gold

Overview

The Darlington Energy Complex (DEC) is a premiere nuclear training centre including ground-breaking innovation and leading-edge technology.
The DEC, a multi-purpose building of approximately 300,000 square feet, includes offices for 450 staff, public information centre with interactive educational displays, 160-seat auditorium, warehouse space, and technologically advanced training centre and tool testing facility that included a full-scale mock-up of the reactor core. The structure of the center consists of cast-in-place concrete foundations, structural steel framing, insulated metal wall panels and aluminum framing with high efficiency glazing. This multi-use facility required many types of acoustic treatment to architectural components to prevent sound transmission from mechanical and tool testing areas to the office space.
The DEC is a Gold LEED certified project, achieving a 73% reduction in exterior lighting power, 50% reduction in interior lighting power, including occupancy and daylight sensors, 35% indoor water saving, and a 90% increase in efficiency in the condensing boilers.

← Return to Projects

project photos
project photosproject photosproject photosproject photosproject photos
.