Rosemont Aquatic Centre in Montréal, QC | Magil Construction

Rosemont Aquatic Centre

Location Montréal, QC
Contract Method General Contractor
Sector Institutional
Sub sector Sports
Client City of Montréal
Completion Date Completed - May 2022
Size 51,170 square feet
features Urban Environment, LEED Certification
Aquat Rosemont 6

Rosemont Aquatic Centre

Aquatic construction expertise in the heart of a vibrant neighbourhood

Magil built the Rosemont Aquatic Centre for the City of Montréal in the borough of Rosemont–La Petite-Patrie. Connected to the existing Centre Rosemont, the facility brings together two 25-metre pools and multipurpose spaces for sports and community activities.

The project drew on Magil’s expertise in aquatic facilities, sustainable construction and site management alongside public buildings that remained in operation. Precision pool construction, specialized building systems and measures to protect the surrounding community were key priorities throughout delivery.

Aquat Rosemont 4

Technical Execution | Precision Pool Construction

Pool construction required close attention to dimensions, elevations and connections with the pool decks and equipment. The competition pool’s dimensional requirements called for rigorous quality control during construction. Magil coordinated specialist trades and work across disciplines, overseeing construction quality through commissioning. The project demonstrates its ability to deliver facilities where precise workmanship and coordinated systems are essential to overall operation.

  • Specialized Systems | Coordinating Water and Air Treatment

The centre incorporates ultraviolet water disinfection and automated ventilation. These complementary systems support the aquatic environment and help control contaminants associated with chlorine use. Coordinating water treatment, ventilation and heating equipment was an important part of the mandate. Magil managed the integration of specialist trades and system commissioning to prepare the facility for handover. Acoustic panels suspended from the ceiling and installed on the pool hall walls help control reverberation and improve comfort.

  • Site Challenges | Building Beside Schools and Operating Facilities

Located in a residential neighbourhood, the site was bordered by schools and three Centre Rosemont buildings that remained operational during construction. This setting required careful work planning and measures to protect the public. To reduce construction noise reaching the schools, Magil installed barriers made from shipping containers stacked two levels high. The team also built an enclosed, filtered tile-cutting area with source extraction to contain dust and protect permanent ductwork. These measures demonstrate a practical approach to managing a constrained site, combining public safety, nuisance reduction and protection of completed work.

Sustainable Construction | Delivering LEED Gold Requirements

The LEED Gold-certified centre combines geothermal energy, water conservation measures and extensive natural light. Construction had to integrate these strategies while meeting the technical demands of an aquatic facility.

Magil tracked construction requirements supporting certification, including waste management, low-emitting materials, air filtration and duct cleanliness. Its role connected the project’s environmental objectives with day-to-day site practices.

Aquat Rosemont 1

Collaboration | Keeping Delivery Coordinated

Working under a lump-sum contract, Magil collaborated with the City of Montréal, design consultants and trade contractors to coordinate construction, resolve technical questions and manage changes. Regular communication and project tracking through Procore supported this work. The approach helped coordinate interfaces between the pools, building systems, finishes and existing buildings, while the team also managed pandemic-related health measures and procurement constraints.

  • An Accessible Neighbourhood Resource

The aquatic centre builds on Centre Rosemont’s role as a hub for sports and community life. Connections to the library and other spaces encourage people to explore different activities, while the architecture draws on features of the existing Art Deco building. Universal changing rooms, accessible pool entries and multipurpose rooms welcome a broad range of users. The project reflects Magil’s ability to deliver specialized facilities that support both sport and everyday community life.

Aquat Rosemont 6
Aquat Rosemont 3
Aquat Rosemont 2
Aquat Rosemont 4
Aquat Rosemont 1
Aquat Rosemont 5
Aquat Rosemont 7