Grand River Transit Maintenance Facility in… | Magil Construction

Grand River Transit Maintenance Facility

Location Waterloo, Ontario
Contract Method Lump Sum
Sector Industrial
Sub sector Transit and Facilities
Client Region of Waterloo
Completion Date Completed - Apr 2022
Size 305,000 square feet
features LEED Silver
GRT Main 1600x1068

Grand River Transit Maintenance Facility

This 305,000 square foot project is a new 200 bus facility to expand bus storage and bus maintenance capacity for both standard and articulated buses, built on 17 acres of property located at 300 and 350 Northfield Drive in Waterloo. The Region of Waterloo’s Grand River Transit Bus Maintenance Facility will provide the necessary fleet maintenance and storage required to meet transit ridership goals established in the Regional Transportation Master Plan and the Grand River Transit Business Plan. It will accommodate Mobility Plus vehicles, regular buses and articulating buses; articulating buses will be introduced to the fleet beginning in 2021. Pursuing a minimum LEED® Silver Certification this is an energy-efficient/sustainable construction project and includes energy conserving mechanical and electrical equipment, fixtures and controls. The construction of the facility will include reduction, sorting and monitoring of construction waste and site impact.